Chelsea Green Condominiums

Swift Current, SK

Faced with a limited budget and tight schedule, the developer determined that prefabricated modules would ensure a higher quality of construction, meet tighter construction tolerances and dramatically accelerate construction time, producing a parallel reduction in cost.

Developer quote: I’m ecstatic! I could not have achieved this price, quality or timing with site built construction. Jayco technology is the real deal! From the date of contract to occupancy permit was five months. Jayco turn keyed my entire project.

Building type: Condominium

Total number of units: 60